FACILITIES PROJECTS

Below is a list of current projects for facilities at Cherry Run Camp. 

Are you or a church group interested in helping out with any of these projects? Learn more about Work Days or contact the volunteer coordinator.

  • Build shelves in boys’ for cleaning supplies. Two shelving units need constructed, and if you are interested in this project, please coordinate with me to see what supplies we have at camp.
  • Install laminate flooring in the upstairs bathroom in the nurse’s cottage. (we have the laminate.)
  • Install ceiling tile, 12 x 12, in Shumaker. (we have the tile)
  • Lift carpet and store in YAP room.
  • Scrape paint in Cramer’s Cottage, two bedrooms. Paint with mold-resistant paint.
  • Install bird-proof netting on Cramer’s porch.
  • Move usable paint from garage to bottom of boys’ dorm for winter storage. (Oct. 18)
  • Cover tabernacle chairs.
  • Cover beds with plastic sheeting. (sheeting should be in the rooms)
  • Move campers into the pavilion. 
  • Replace the gravel ramp leading to the bridge; replace with outdoor boards.
  • Boys’ dorm railings and deck could be stained.
  • Scrape and paint the platform in the chapel.
  • Replace the light bulbs in the chapel.
  • Paint the edge of the stone pillar at camp’s entrance.
  • Hole reported in the back of the tabernacle, bottom right of the middle door; assess and repair.
  • McIntosh—replace windows (Evan crew)
  • Sound system revamp (Eaton crew)
  • You may see other jobs that need done. Add them to the list—suggestions always welcome!

Camp is going on right now! Can't join us in person? Join us online!

Learn more about our upcoming work days